- Location
- Long Island NY
im setting up my Apex right now and I was wondering if I can finish programming the outlets on my EB8 BEFORE plugging in all of my equipment.
I do not want to turn my whole system down while im working on the program so how should I do this?
finish programming the outlets, than at once plug my equipment in? should I turn off the Apex before doing this?
or should I plug each one in before programming it.
thanks
I do not want to turn my whole system down while im working on the program so how should I do this?
finish programming the outlets, than at once plug my equipment in? should I turn off the Apex before doing this?
or should I plug each one in before programming it.
thanks