I was wondering if anyone knows a minimum time one can wait between gluing PVC and running water through the line.
I'm planning on setting up a frag and want to run it off the existing plumbing so I will be cutting into the PVC and gluing a Tee off to head over to the frag tank.
I'm just not sure how long it will take for this pipe segment will be ready to have water running through it which will determine how long my display will not be getting filtered for.
I'm planning on setting up a frag and want to run it off the existing plumbing so I will be cutting into the PVC and gluing a Tee off to head over to the frag tank.
I'm just not sure how long it will take for this pipe segment will be ready to have water running through it which will determine how long my display will not be getting filtered for.